The Federal Ministry of Works has announced the closure of the Oworo-bound section of the Third Mainland Bridge from Saturday night until 6:00 p.m. on Sunday, May 26, 2024.
The Federal Controller of Works in Lagos State, Olukorede Kesha, announced the closure in a statement on Saturday, May 25.
The controller noted that the closure was to enable the ministry to carry out urgent repairs on the bridge.
FG opens Third Mainland Bridge with speed cameras, warns motorists
Kesha, who regretted all the inconveniences that the closure might cause motorists, advised them to use alternative routes.
Latest posts by Segun Ojo (see all)
- Sanwo-Olu cancels November sanitation exercise in Lagos - November 27, 2026
- Adeleke sworn in for second term as Osun governor - November 27, 2026
- Jigawa 2027: We share different political identity, my son capable to govern, says Lamido - November 27, 2026
Advertisement







