Third Mainland Bridge
Advertisement

The Federal Ministry of Works has announced the closure of the Oworo-bound section of the Third Mainland Bridge from Saturday night until 6:00 p.m. on Sunday, May 26, 2024.

The Federal Controller of Works in Lagos State, Olukorede Kesha, announced the closure in a statement on Saturday, May 25.

The controller noted that the closure was to enable the ministry to carry out urgent repairs on the bridge.

FG opens Third Mainland Bridge with speed cameras, warns motorists

Kesha, who regretted all the inconveniences that the closure might cause motorists, advised them to use alternative routes.

The Star

Advertisement

LEAVE A REPLY

Please enter your comment!
Please enter your name here