News

Third Mainland Bridge shut for repairs

The Federal Ministry of Works has announced the closure of the Oworo-bound section of the Third Mainland Bridge from Saturday night until 6:00 p.m. on Sunday, May 26, 2024.

The Federal Controller of Works in Lagos State, Olukorede Kesha, announced the closure in a statement on Saturday, May 25.

The controller noted that the closure was to enable the ministry to carry out urgent repairs on the bridge.

FG opens Third Mainland Bridge with speed cameras, warns motorists

Kesha, who regretted all the inconveniences that the closure might cause motorists, advised them to use alternative routes.

The Star

Segun Ojo

Recent Posts

NiMet issues safety advisory, forecasts thunderstorms, dust haze across Nigeria

The Nigerian Meteorological Agency (NiMet) has predicted dust haze and thunderstorms across the country from…

1 hour ago

2027: Kwankwaso accuses Gov Abba of using EFCC to target him

Former Kano State Governor, Senator Rabiu Musa Kwankwaso, has accused Governor Abba Kabir Yusuf of…

1 hour ago

EPL fixtures: Arsenal host Man City as Liverpool, Everton clash in Merseyside derby

Manchester City will travel to face Arsenal at Emirates Stadium this weekend in a must-win…

2 hours ago

Fury, Joshua set for December 11 heavyweight showdown

The highly anticipated heavyweight clash between Tyson Fury and Anthony Joshua will begin at 1.30am…

3 hours ago

NAFDAC shuts Abuja market, seizes N300m fake products

The National Agency for Food and Drug Administration and Control (NAFDAC) has shut Zuba International…

4 hours ago

FirstHoldCo leads NGX trading as investors gain N62bn

The Nigerian stock market rebounded from a seven-day slump on Thursday, November 26, 2026, recording…

4 hours ago

This website uses cookies.